Parameters





Features
1) TIG and MIG are to be adopted for this ship .
2) The ultrasonic inspection to be carried out for the cross joint of seam and other important place .
3) From 5083-H116 material to welding wires to welding use gas & experienced qualified welders .
4) The bottom is double bottom system and constructed on the longitudinal system of framing .
5) Solid floors will be provided at every frame station , the side transverse frames will be fitted at a space of 500mm ."